Descargar Imprimir esta página

CLAS OE 0428 Manual De Instrucciones página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

OE 0428
CABLE REELS 3x2,5mm
INTRODUCTION
Please read these operating instructions carefully and note the information given. Use these
operating instructions to familiarize yourself with the product, the proper use and the safety
instructions.
PARTS LIST
1
Hose reel
2
Metal bracket
3
6*60mm screw
4
6*12mm screw
SETUP
The reel must be installed horizontally, vertically on the cement pillar, cement wall or steel structure.
1. Take out the unit and accessories from the box,
2. Choose a suitable place.
3. Take the mounting bracket as a template to mark the position for screws and drill four holes on
the wall. Fig.1
4. Fix the bracket by four 6*60mm screws accordingly,
5. Slip the reel to the mounting bracket,then fasten it by screw. See Fig.3
Note: 1. The reel should be installed to a wall or post horizontally.
2. It is suggested to mount the reel approximately 1 meter above the ground.
Fig 1
Fig 2
20m
2
Fig 3

Publicidad

loading