Descargar Imprimir esta página

Pfister Marielle GT46-M0BK Instrucciones De Montaje página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

9
9A
9B
9D
9B
9C
Thread the Handle Adapters (9A) over the Valve Stems (9B) and tighten so that the Handle
Adapters (9A) sit on top of the Putty Plate (9C) or Putty Rings (9D).
10 HANDLE INSTALLATION
10
10A
10B
10D
Connect Handles (10A) onto Handle Adapters (10B). Be sure Valves and Levers are in
the "OFF" position. Secure handles by holding the Lever (10C) in place and tighten the
Hubs (10D) by rotating them in a clockwise direction. To remove handles, rotate Hubs
(10D) in a counterclockwise direction.
11 WATER SUPPLY CONNECTIONS
ENGLISH
9A
9B
9D
10A
10B
10C
11
11B
11A
HOT
Connect water Supply Lines (11A) to Faucet Inlets (11B). Hot water supply lines go into
left inlet. Cold water supply lines go into right inlet. (Supply lines not included). Please
follow manufacturer's instructions when installing supply lines.
12 POP-UP INSTALLATION
DRAIN BODY INSTALLATION
12
12A
Install and adjust Pop-Up (12A) using separate instructions supplied with the Pop-Up
assembly.
13 UNIT START UP
4
11B
11A
COLD

Publicidad

loading