Descargar Imprimir esta página

ATOMSTACK MR 20 Manual Del Usuario página 8

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Step 2 Replace the control box
Method 1
The trial installation control box is paired with the hole position before the type, and the control box is directly installed.
Remove the original control box and cable
The trial control box is not matched with the hole position in front of the type, and it is necessary to wear a T-nut and
Method 2
lock two M5*8 screws.
Install the control box in the manifest
Don't overtighten it
M5*8
Install the T-nut
Install the control box in the manifest
Tighten the screws
7
M5*8

Publicidad

loading

Productos relacionados para ATOMSTACK MR 20