FLOOR
17 - FINAL CHECKS
Power the automatic system:
• If installed, check for the correct operation of the limit switch manually moving the leaf.
Run one or more operation cycles and check:
• The correct operation of the safety devices;
• The correct movement of both the leaves;
• That the foundation plate is solid;
• That the automatic gate complies with the essential safety requirements required by the Machinery Directive
(2006/4/CE)
18 - FLOOR 880-884 INSTALLATION WITHIN OLDER FLOOR FOUNDATION BOX
If you need to install the operator within an existing box you must check that the box has the supporting post of
the leaf shaped like À 18 .
[
If the foundation box does not have the lightening in À 18 you must create them using proper tools (flexible),
the work area will need to apply a protective coat to avoid oxidation (zinc spray).
19 - MAINTENANCE
Carry out periodic checks on the gate with particular attention to:
• Check the hinges;
• Check the correct operation of the safety devices;
• Unlock the operator and verify there is no friction points during the whole stroke;
• Check the self-lubricating bushing.
Periodically check the correct functioning of anti-crushing safety and the efficiency of the unlocking system which
allows the manual operation (see relevant paragraph).
The safety devices installed must be checked at least each 6 months.
Gi.Bi.Di. S.r.l. reserves the right to modify the technical data without prior notice depending on the product
development.
20 - MALFUNCTIONING
In the event of any malfunction, cut the power to the system and call in a qualified technician (installer).
During out of service activate manual release to allow manual opening and closing.
]
[
]