Descargar Imprimir esta página

Sofamel CIT-10 Manual De Instrucciones página 58

Medidor de aislamiento digital

Publicidad

Idiomas disponibles

Idiomas disponibles

Making basic measurements
4.3. Measuring resistance
To avoid possible damage to the Meter or to the equipment under test, disconnect circuit power
and discharge all high voltage capacitors before testing for continuity.
Switch rotary switch to
position, Input terminals and test leads connecting as follows figure.
The continuity test features a beeper that sounds as long as a circuit is complete. The beeper
sounds when a short (<3 Ω).
4.4. Insulation test
Warning: When the test voltage output, do not rotate the rotary switch to prevent damage to
the meter.
Insulation tests should only be performed on dead circuits. Check the test leads before testing.
Switch rotary to Insulation position. if meter display
, please replease battery.
Insert test leads to High, Low terminals. if the meter display Live, indicator the meter cannot measu-
re on live circuit. please power off Live circuit.
Press TEST.V button to select output voltage;
58

Publicidad

loading

Este manual también es adecuado para:

635390