Assembling The Straps; Assembling The Structure - Trigano Jardin 880115 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38

8. Assembling the straps

Ensure that the ground has been correctly levelled before installing the straps. It is imperative that they lie flat on the ground.
If the pool is installed on a concrete slab, leave pockets for the strap fastening bolts. 18 mm diameter holes are sufficient.
IMPORTANT: use the screws on top and the nuts on the bottom to assemble. A screw is provided for each hole.
The assembly process includes one strap at the end and another one in the middle of each post.

9. Assembling the structure

To ensure the correct spacing and alignment, fasten the top plates on to the support legs, install the ledge pieces without
fastening them and slide in the bottom rails. Then proceed with assembling the pressure plates before covering them with
sand:
OSMOSE Oval
7254
Centre strap
7528
Edge strap
0623
M8 nut
99
0923
M8 x 20
Assembly Guide 880115-rev A

Publicidad

Tabla de contenido
loading

Tabla de contenido