PREPARING THE LAND
EN
UNACCEPTABLE LOCATION: Sloping, uneven ground. Sandy, rocky or soggy ground.
MARK THE INSTALLATION AREA
In order to avoid any excess humidity in your land, you should install a draining system under the pool, and around it by building a decompression
well.
LEVELLING
How to level:
Finishing:
Important: in the case of being non-stable land, you should make a concrete slab instead of a bed of sand.
PARTIAL OR COMPLETELY IN-GROUND INSTALLATION
Natural
Anti-roots or felt
ground
Geotextile
blanket
Layer of
stabilized gravel
We recommend to ask a
professional to prepare
H
the foundation slab.
Protection and
alveolar draining roll
of HDPE
Peripheral
Watertight
drainage
film
The concrete slab is not included.
Dosing 350 kg/m
(standardized type C125 430)
3
Ref. 786226 (EG) L: 3,06 x W: 3,06 x H: 0,10 m - 0,94 m
Ref. 783333 (E) L: 4,74 x W: 4,74 x H: 0,10 m - 2,25 m
Ref. 783331 (E) (EG) L: 4,06 x W: 4,06 x H: 0,10 m - 1,65 m
Draining gravel
Wood frame
ø10-30
Respect the direction of the alveolar
protection roll, with the bubbles
against the wall, to allow the wood
to "breathe".
Fig. 5
Descompression
Concrete slab
l
wel
of concrete
3
of concrete.
3
of concrete.
3
1
2
Fig. 6
1- Wood frame
2- Roll of alveolar protec-
tion an drainage of HDPE
35