F1000-UPS OWNER'S MANUAL
The display will return to the set brightness level upon entering Setup Mode, or UPS Mode.
Automatic Regulation Setup
Setup for Automatic Voltage Regulation parameters.
Outlet Bank 2 Setup
Adjusts the battery charge threshold in which Outlet Bank 2 is shut off to conserve power for the critical loads connected to Outlet
Bank 1. If set to OFF, Outlet Bank 2 will shut off immediately when the unit goes into UPS Mode.
IR1 Control Setup
IR1 Control Setup is a two-step process in which the IR remote control signal is sampled, and tested by outputting the learned signal
on the output jack.
IR Output Delay
IR Output Delay is the time delay before outputting the IR signals on the IR output jacks after the unit goes into UPS mode.
IR Output Delay time starts at 0 sec, incremented in 5 sec intervals, with a maximum value of 60 sec.
Setup Buzzer Mode
Change the UPS BUZZER MODE to set it to on or off.
UPS Test Mode
UPS Test Mode places the unit in UPS Mode temporarily to verify that the UPS inverter can adequately supply the connected load.
System Info
Displays the brand, model number and firmware revision
ADVANCED OPERATION
A connection to a UPS can benefit projector bulbs, server based products, and units with volatile electronic memories found in but
not limited to Pro Audio, Broadcast, and High-End Home Theater equipment. The F1000-UPS takes this to the next level with a num-
ber of features designed specifically for AC Power back up applications.
Critical Load Function
One of the user programmable settings in the F1000-UPS software is the Low Battery Non-Critical Load (NCL) Shutoff threshold.
This sets the battery capacity level at the point where the NCL outlets are turned off and all remaining battery power is reserved
for equipment plugged into the 4 critical load outlets. This value is stored internally by the UPS and is not dependent on having the
software running on a computer.
Patent-pending Learning IR Control
The learning IR function lets you program the F1000-UPS to send standby or shut-down commands to components such as DLP
ceiling projectors. If the power fails, the projector's lamps are turned off while the F1000-UPS continues providing battery power to
the projector's cooling fan. Proper shutdown is ensured and expensive lamps are protected from damage.
NOTE: This function should only be used with discrete IR codes. Programming an On/Off toggle command could result in the equip-
ment being turned ON during a power failure!
IR Power Failure Operation
The F1000-UPS can learn two IR commands. The learned commands will be transmitted on both output jacks so you have the ability
to control 2 different pieces of equipment or use a 2-step macro for one component.
1. After a power failure and the selected delay, the IR codes will be sent to both outputs. The IR LED's will flash once per second dur-
ing the delay time and will stop flashing after the IR code is sent.
2. If the delay settings are the same for both IR1 and IR2, the IR2 code will be sent to both outputs 2 seconds after IR1.
3. The IR commands will also be transmitted immediately after the battery charge falls below the critical load battery threshold. This
ensures that equipment will be shutdown properly if the F1000-UPS's load level is extremely high and the backup time would be less
than the selected IR output delay.
4. There is no IR output after the power is restored to the system.
8