Commissioning and maintenance
Start-up by turning all ball valves to the operating posi-
tion. Close all flushing and filling valves and turn caps.
Setting the volume flow.
For further information see separate manual and
www.sonnenkraft.com
Pressure loss and residual delivery
head
PSKR18
Pump Solar 15-65
Residual delivery head
PSKR18
PSKR18HE / PSKR18HE-O
Pump PM2 15-105
Residual delivery head
PSKR18HE (-O)
GB
25