General information

All whirltubs produced by Hoesch are delivered on a self-supporting frame with adjusted height. The system components
(whirl pump, control unit and blower) are located in places shown in the annexed dimensioned diagram. In case of mod-
els where you can choose between the factory-made right-hand and left-hand version, the right-hand version is delivered
as a standard (always looking from the outside, standing in front of the drain/ overflow fitting).
What you should pay attention to:
Check whether the delivery is complete and undamaged.
We will not be liable for damages that occur during transport and storage.
Do not put the bathtub on previously installed pipe system! Avoid any impacts!
During the installation cover the bathtub surface and any system elements that stick out, which will protect them
GB
against damages and excessive dirt.
Individual elements of the system must remain accessible for later maintenance works!
02

Mounting/Installation

Place the bathtub and level it with the help of plastic legs with adjusted height.
Protect the leg with a flat securing nut.
For acoustic insulation (in order to avoid the transfer of material sound to the wall), use a wall profile
available in the market (article No. 6915, essential equipment).
In case of models that are intended to bo connected with the wall, an edge strap for the bathtub is
essential (essential equipment: bathtub anchor, article No. 690401, install according to the attached
installation manual).
During the installation please pay attention to the fact that the apron must support the bathtub edge!
02.01

„HOESCH Combi-Plus" (additional equipment)

(bathtub tap with special drain/overflow fitting)
An additional pipe interrupter is essential for the installation. Water connection should be made according to the attached
installation manual.
02.02

Water supply installation

The water and drain system should be made in compliance with the binding regulations.
03

Test run

Before mounting the apron, the sanitary and electrical connections should be made professionally, and after that subse-
quent cleaning should be done. Fill the bathtub with water with temperature 40 +/- 5°C and switch the system on for at least
10 minutes, checking its maximum and / minimum number of revolutions. Next you should switch the whirl system off, and
after at least 10 minutes check the hydrostatic of all pipes, connections and joints.
04

Bathtub apron

After a test run finish encasing the bathtub. Between the bathtub edge and the casing allow for a gap 3-4 mm wide for
silicon seal (consider the producer's tips regarding the usage of the product!). While encasing the bathtub it is necessary to
consider the following points:
1.
All systems of conduits and components of the system initially installed in the bathtub and the ones installed at the
factory must rest freely behind the walling.
2.
The displayed system components, first of all the fan side of the pump, should be protected against dirt by covering
them.
3.
Mount the apron in such a way that the system components are protected against touching and water splashing. The
bathtub's operation without the apron is not allowed, except for the test run.