Installation; Assembly Kb1B Sgb E (Eurocondense 125 Kw - 215 Kw) - BRÖTJE KB1B SGB E Serie Instrucciones De Montaje

Ocultar thumbs Ver también para KB1B SGB E Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
5

Installation

5.1

Assembly KB1B SGB E (Eurocondense 125 kW - 215 kW)

Fig.7
Installation of cascade kit KB1B SGB E
9,14
12,14
5
17
5
3
6
18
6
10,14
12,14
6
6
3
12,14
10,14
15
1 Flow distributor SGB 250 Duo
2 Connection flange DN 65
3 Adaptor flange DN 65 x DN 40
4 BDF valve ½"
5 Flat gasket DN 65
6 Flat gasket DN 40
7 Flat gasket DN 80
8 Hexagon bolt M16 x 60
9 Hexagon bolt M16 x 55
10 Hexagon bolt M16 x 90
11 Hexagon nut M16
7306084 - 06 - 07042020
Assemble the components listed in the table as shown in
20
19
1
4
9,14
12,14
5
17
5
3
6
18
9,14
6
12,14
10,14
9,14
12,14
6
17
6
12,14
12,14
3
15
10,14
Important
The shut-off valves, check valves and pumps shown with dotted
lines are not part of the standard delivery.
16
7
11,13
8,13
1
5
9,14
5
12,14
5
21
2
15
12,14
10,14
15
12 Hexagon nut M12
13 Washer B17
14 Washer B13
15 Rubber gasket
16 Flange PN 6 DN 80
17 Shut-off valve DN 65
18 Check valve DN 40
19 Valve extensions
20 Automatic air vent
21 MAG connection
5 Installation
fig .
7
20
16
19
11,13
8,13
4
9,14
12,14
17
5
21
2
12,14
10,14
en
RA-0001882
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kb2b sgb e serie

Tabla de contenido