Maintenance At Every Start-Up; Maintenance At Every Wire Spool/Basket-Type Spool Replacement - Fronius MTG 400i K4 Manual De Instrucciones

Ocultar thumbs Ver también para MTG 400i K4:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
Maintenance at
-
every start-up
-
1
1
*
-
Maintenance at
-
every wire spool/
-
basket-type spool
replacement
1
1
Maintenance at
-
every start-up
Check wearing parts
-
Replace faulty wearing parts
Purge the gas nozzle of welding spatter
Check gas nozzle, spatter guard and insulation for damage and replace damaged
components.
In addition to the steps listed above, the following additional steps should always be
carried out prior to start-up, for water-cooled welding torches:
-
Ensure that all coolant connections are leak-tight
-
Ensure that there is a proper coolant return flow
Clean the wirefeeding hose with reduced compressed air pressure
Recommended: When replacing the inner liner, clean the wearing parts before re-in-
stalling the inner liner
Remove the extraction nozzle and ensure that the interior of the OPT/i FumeEx is not
blocked
1
2
2
2
41

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Mtw 500i k4

Tabla de contenido