BEFoRE oPERaTIoN
Handling unit (centre of gravity)
When the unit is lifted, pay attention to the following points:
1 Do not remove the wooden base until its final position.
2 To prevent the unit from overturning, pay attention to the centre of gravity as shown in the following figure:
RASC-(4-6)HNPE
3 Due to the high weight of these units, use the appropriate machinery for these works.
5 BEFORE OPERATION
!
C A U T I O N
•
Supply electrical power to the system for approximately 12 hours
before start-up or a long shutdown. Do not start the system
immediately after power supply, it may cause a compressor failure
because the compressor is not heated well.
•
When the system is started after a shutdown longer that approximately
3 months, it is recommended to check the system by your service
contractor.
4
PMML0399B rev.0 - 11/2015
Model
Gross weight (kg)
RASC-4HNPE
218
RASC-5HNPE
218
RASC-6HNPE
218
RASC-8HNPE
333
RASC-10HNPE
336
•
Turn OFF the main switch when the system is to be stopped for a long
period of time: If the main switch is not turned OFF, electricity will be
used, because the oil heater is always energised during compressor
stopping.
•
Make sure that the RASC unit is not covered with snow or ice. If
covered, remove it by using hot water (approximately 50°C). If the
water temperature is higher that 50°C, it will cause damage to plastic
parts.