Speci C Safety Rules; Pre-Start Checks - Altrad Belle MEGAVIB+ Manual Del Operador

Ocultar thumbs Ver también para MEGAVIB+:
Tabla de contenido

Publicidad

For the safe and proper operation of the 'MEGAVIB+', make sure that operators have been instructed in the correct use of this
machine.
Before connecting the motor to the electrical system, make sure that the voltage and frequency match with the ones stated on
the machine serial plate, located in the top part of the plastic housing.
ENSURE that all housing screws are tight before starting work.
AVOID the attening of the cable by heavy machinery with could cause breakage.
DO NOT CONNECT the exible shaft to the power unit when it is working.
DO NOT OPERATE the motor when this is working and without transmission.
DO NOT WORK with transmission or poker in bad conditions, the motor overheats.
DO NOT WORK with the plastic housing broken.
DO NOT PERMIT untrained personnel to operate the motor or connections.
MAINTAIN free ventilation of air.
KEEP the motor in a clean and dry area.
MAKE SURE that the electrical cable is with the proper section and functioning properly.
BEFORE DOING any type of repair, DISCONNECT the motor from the electrical system.
WHEN CONNECTING to a generator, make sure that the output voltage and frequency is stable, right, and has the proper power,
(the converter's feeding voltage should not vary more than ± 5% as stated on the motor's plate).
WHEN FINISHING the job or when taking a break, the operator should unplug, disconnect it from the electrical system, and have it
placed in such a way that it should not fall or tip.
In addition, all local regulations should be respected.
Vibration
Some vibration from the poker is transmitted through the exible hose to the operator's hands.
PPE (Personal Protective Equipment).
Suitable PPE must be worn when using this equipment i.e. Safety Goggles, Gloves, Ear Defenders, Dust Mask and Steel Toe capped
footwear. Wear clothing suitable for the work you are doing. Always protect skin from contact with concrete. Suitable ear defenders
Sshould be used because the acoustic power level of this machine is 92 dB and the acoustic pressure level is 86 dB.
1. Before starting the job, ensure all handling and safety devices are operating correcting.
2. Regularly inspect the condition of the electrical cables
3. If defects are found in the safety devices or other defects which could reduce the safe handling of the equipment, notify the
proper responsible person immediately.
Shaft Connection To Power Unit
Power unit is designed to facilitate a quick and safe connection to exible shaft.
Connection Procedure:
1. Face the male hexagon of the transmission in the female hexagon of the motor.
2. Once faced the hexagons push until making that the anchorage of the transmission enters in the special lodging of the motor.
Connection possibilities
Length of the transmission: 6.5, 10 & 13 ft
Diameter of the vibrator: 25, 38, 48, & 58
Electric Motor Connection To The System
Turn off the motor switch before connecting it.
Electrical Connection
All portable electric appliances are dangerous if abused. This machine will only operate on one voltage. Check the power supply to
ensure it corresponds to the voltageas indicated on the rating label.
Make sure the Power Unit is switched off before you plug it into the power supply.
230v - Always use a Residual Current Device (RCD), (earth leakage trip), plugged directly into the RCD.
115v - When using a portable transformer it must have a minimum output of 2.5kw and to be continuous rated.
Extension Cables
If you need to use an extension cable it must be no longer than 15m / 49.5ft (115v) and 40m / 132ft (230v) in length. The wire section
2
must be 1.5mm
. Ensure that the extension cable is carefully laid out avoiding liquids, sharp edges and places where vehicles might
run over it. Unroll it fully or it will overheat and could catch re. Make sure that any extension cable connections are dry and safe.
CAUTION

Speci c Safety Rules

Pre-Start Checks

Do not use damaged or worn out cables.
Do avoid heavy loads on top of cables.
Operation
16