Applying The Floor Covering And Adjusting The Height - OBO Bettermann UDHOME 2 G Instrucciones De Montaje

Toma de suelo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
ATTENTION
ATTENTION
UDHOME 2 G
Applying the floor covering and adjusting the height
1. Close the hinged cover
plate on it and attach the mounting protection cover
Fig. 11: Lay the screed
2. Lay the screed flush to the top edge of the mounting protection
8
cover
and work it up to the floor socket.
6
Applying the floor covering and adjusting the
height
Risk of damage through joint mortar!
Contact between the floor socket with joint mortar leads to product
damage!
When applying joint mortar to the expansion joint along the floor
socket, the frame and cover must be protected against the joint
material.
Risk of damage from joint material/adhesive!
The ingress of the joint material/adhesive into the floor socket can
lead to product damage!
Thoroughly clean the interior after floor covering work.
1
, place the the footfall protection
8
.
43 |EN

Publicidad

Tabla de contenido
loading

Tabla de contenido