Mounting - HBM C16M Serie Instrucciones De Montaje

Ocultar thumbs Ver también para C16M Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Mounting

5
Mounting
10
S lt should be ensured when mounting the tank that, for
example, no shock loads are applied to the module
when lowering it onto the supports. Even short‐term
loads which exceed the load cell limits can lead to
damage.
S With heavy tanks or unfavorable Installation condi­
tions the use of mounting aids (auxiliary supports, jack
equipment) is recommended.
S The mounting plate and upper module plate should be
firmly fastened to the foundation, respectively the tank
joint.
S The weighing modules should be mounted such that
they are free of transverse forces in the initial state.
This means that the mounted rocker pin load cell
must be lined up as near to the perpendicular as pos­
sible. This is the case when the foundation and tank
Joint are horizontal and the mounting holes on the
foundation and the tank are sufficiently aligned. As
supplied, the transport locking plate is fitted such that
this is the case, thus allowing hole patterns to be
checked easily.
S A anti‐liftoff device can be effected by screwing in a
threaded rod of an appropriate length and checking
with a nut in the lower module plate. The threaded rod
must have a working clearance in a though hole of the
vessel base. Two further nuts are to be checked over
a washer with approx. 2 mm working clearance rela­
tive to the vessel base.
S As protection against welding currents that can dam­
age parts of the transducer, it is recommended that
the EEK4 Earthing Cable is used (included in the sup­
ply).
A1268-3.0 HBM: public
C16M...

Publicidad

Tabla de contenido
loading

Tabla de contenido