7
Operation
C16M...
S Transverse forces during operation, which do not act
in the direction of the guide arm, should be avoided.
S The play on the transverse guide arm should be
checked regularly and adjusted if necessary.
S The play in the tank removal lock should be set to
2 mm.
S The weighing modules without tank removal lock
should not be completely relieved of the Ioad (the load
transfer elements lift off).
A1268-3.0 HBM: public
Operation
15