Bergstrom INTEGRAL POWER II Instrucciones De Montaje página 24

Ocultar thumbs Ver también para INTEGRAL POWER II:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INTEGRAL POWER II
EN
Secure the attachment supports by turning the
13
nuts to tighten the exterior EPDM seal (Point
4) of the unit between 3 mm and 6 mm; the
seal should have a thickness of between 19
and 22 mm.
Important: To prevent water infiltration into the
cabin ensure the tightness of the EPDM seal
with the base of the equipment as is shown in the
diagram.
3-6mm.
Cabin roof
Turn the nuts until the
rubber seal is tight
13
between 3 and 6 mm.
Tighten (4) M8 nuts to the bracket and (4) to
14
the base of the equipment.
EPDM seal
10 mm*
(*) (approx. after tightening)
13
13
12
24
Check the
compression of the
EPDM seal using
a flexometer in the
four corners.
13
14

Publicidad

Tabla de contenido
loading

Tabla de contenido