HOFFLIGHTS SEYCHELLES Manual De Instalación página 17

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SEYCHELLES
INSTALL THE DOWNROD
When hanging the Fan REMEMBER to turn off the power. Follow the steps below to hang your fan properly:
1
Place motor assembly on bottom Styrofoam for
blades installation.
2
Remove hanging ball from downrod provided by
loosening set screw on hanging ball. Remove pin
and clip. Lower hanging ball and remove stop pin.
Slide hanging ball off of the downrod.
Set screw
Clip
4
Slide yoke cover
Canopy
and canopy over
downrod
Thread wires through hanging ball; then slide han-
5
ging ball over downrod; use this hole when setting
the set screw. Insert stop pin into top of downrod
and raise hanging ball. Be sure stoppin aligns with
slots on the inside of the hanging ball. Tighten set
screw securely
Stop pin
hofflights.com
INSTALLATION MANUAL
Stop pin
Hanging
ball
Pin
Downrod
Yoke cover
Motor housing
Set screw
Hanging
ball
Loosen yoke set screws at top of motor housing.
3
Thread electrical wires through threaded end of
downrod and pull extra wire slack from the upper
end of the downrod. Thread downrod into the motor
housing yoke until holes for pin and clip in downrod
align with holes in yoke, make sure wires do not
get twisted. Re-insertpin and clip that were pre-
viously removed. Tighten yoke set screws securely
Clip
Slide downrod through opening in hanging bracket
6
and let hanging ball rest on the hanging bracket.
Turn the hanging ball slot until it lines up with the
hanging bracket tab.
IMH-100 v.01
Wiring
Yoke set screw
Downrod
Pin
Hanging bracket tab
Hanging ball slot
Motor housing
17

Publicidad

Tabla de contenido
loading

Productos relacionados para HOFFLIGHTS SEYCHELLES

Este manual también es adecuado para:

5.0100.22225.0100.2211

Tabla de contenido