IKAR ASS-2 Manual De Instrucciones página 19

Ocultar thumbs Ver también para ASS-2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
Personal protection - preparing for operational readiness
Please note: operational readiness requires that the IKAR sleeve has already been installed prop-
Insert the cantilever arm into the IKAR sleeve.
Release the socket pin (
Then fold the cantilever arm upwards (
The ASS-2 cantilever arm is now ready for basic use.
It is disassembled in the reverse sequence.
2
1
B
Please note:
erly. Note whether it is horizontal or vertical.
) by pressing with the thumb and pull out.
A
) and secure with the socket pin (
B
A
C
19
).
C
Similar to illustration
GB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ass-1

Tabla de contenido