- English -
Installation (cont.)
For installation in a block wall
1. Select a level location to build the waterfall. Begin by placing a
reservoir on the ground and building the stones around it.
NOTE: It is very important that the stones are level, so be sure
to check that the structure is level from front to back as well as
left to right.
NOTE: Reservoir and stones are NOT INCLUDED!
2. Two stones need to be cut in order to fit the pump power
cord and the tubing through the back.
3. To assist with keeping the wall from leaning, place a layer of
roofing shingles along the back wall on this layer.
4. When the wall has reached the desired place the spillway onto
the wall. Then continue building the rest of the wall.
5. Cut the stone that goes on the top of the spillway before
building the next layer of stones. Or use a retaining wall block
cap in place of the cut and add an inch of roofing shingles
under the spillway.
NOTE: The thickness of the weir is approximately 1". You can
cut several pieces of stone to make this fit.
6. Route the power cord of the pump through the hole in the
resovior and then route the tubing through the same hole.
●
Connect the tubing to the pump and place the pump in the
reservoir.
NOTE: Pump and tubing are NOT INCLUDED!
●
Fill the tub with water.
Questions, problems, missing parts?
Before returning to your retailer, call us at 1-866-627-3435, 8 a.m.-6 p.m., EST, Monday-Friday, or
email us at customercare@oase-livingwater.com. Or visit our website at www.oase-livingwater.com
1.
2.
3.
4.
GFCI
5.
6.
GFCI
GFCI
GFCI
5