CRH Leviat HALFEN FPA Instrucciones De Montaje página 4

Anclaje para panel prefabricado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

HALFEN FPA
Installing the bottom cast-in support in the precast panel
1
Angle bracket
Polystyrene
recess former
2
On-site reinforcement
3
4
The bottom cast in support FPA-3/5-E consists of an U-bracket, an angle bracket
and a polystyrene recess former, delivered preassembled.
U-bracket
Insert the reinforcing stirrups, through the provided holes, dimensions according
to the table.
Bottom cast in support - additional reinforcement dimensions [mm]
Load range
d
,
s
E
e
l
E
Ø i
E
Fix the cast-in support with nails to the formwork. Nail holes are provided in
both, the U-shaped bracket and in the angle bracket.
Note: Auxilliary construction must be fl ush with the angle bracket surface!
→ upper concrete edge = lower edge of auxilliary construction
Wooden auxilliary
construction
Upper concrete edge
l
E
d
,
s
E
60°
for load range 34,0 to 56,0
e
5.0
8.0
11.5
16.0
6
6
8
8
-
-
-
250
250
250
350
24
24
32
32
Upper concrete edge
© 2020 HALFEN · INST_FPA 09/15 · www.halfen.com
Assembly Instructions
Ø i
E
22.0
34.0
46.0
8
10
12
-
-
25
42
400
500
500
32
40
48
56.0
12
52
600
48

Publicidad

Tabla de contenido
loading

Tabla de contenido