HALFEN HFV
4. Insert the dowel, lower and adjust the panel
Insert the dowel into the socket in the upper panel while
the panel is still suspended from the crane.
The internal diameter of the HFV 5 Socket is designed to
hold the dowel in place. The HFV-K Plastic cap can be used
with the HFV 1 Slotted socket to secure the dowel.
A tool must be used to hold the dowel with other socket
types .
While slowly lowering the upper panel the dowels slide
into the sockets of the previously installed lower panel .
Ensure that the dowels slide into the sockets correctly;
avoid contact with the lower concrete slab to prevent any
damage (spalling). The panel is subsequently adjusted .
Caution! Risk of injury!
NEVER put your hand UNDER the suspended
precast panel!
© 2020 HALFEN · INST_HFV 02/16 · www.halfen.com
5. Correct dowel installation
Check the correct orientation of the dowel if using the
HFV 2 Slotted steel socket or the HFV 1 Slotted plastic
socket. The dowel has to be upright!
6. Securing the panel
The panel must be secured in position until the mortar has
completely hardened (e.g. using wooden wedges bet-
ween the precast panel elements and the main structure or
by using an ancillary-aid in the horizontal joint).