12.7 Installation of the refractory walls kit
The kit consists of two supports (one left A and one right B), one left refractory wall C, a bottom one D and a
right refractory wall E.
For the insertion of the kit inside the combustion chamber, proceed as follows:
•
Open the door and remove the burn pot F (Fig. 5.7.1) and the mounting bracket G by acting on the two screws H
(Fig. 5.7.2);
F
•
Insert the two supports A and B ensuring that the two blades present in the rear part of the supports
are inserted into the suitable slots I inside the combustion chamber (Fig. 5.7.3 - Fig. 5.7.4);
A
30
C
A
Fig. 5.7.1
B
I
Fig. 5.7.3
D
E
B
H
G
004778270 - 24/07/2020
Fig. 5.7.2
Fig. 5.7.4