Operating Information - Leister IGNITER BM4 Instrucciones De Funcionamiento

Soplante de aire caliente
Ocultar thumbs Ver también para IGNITER BM4:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15

Operating information

• Only use the device when installed in a heating boiler.
• Allow the device to cool down after ignition
– Connection: Blower and heating separate, switch off heating and ventilate with blower.
– Connection: Blower and heating, switch off heating and ventilate with secondary blower.
• The installation should be as horizontal as possible (reduces the smoke gas back-pressure).
• Only suck in clean air (see accessories 107.286 and 107.287).
Connection
Blower and heating separate
Brown (heating phase) gray (neutral conductor)
Accessories
Only Leister accessories may be used.
107.286 Air hose
107.287 Hose bracket
141.005 Heating element 120 V~ 1050 W
136.918 Heating element 120 V~ 1500W
141.003 Heating element 230 V~ 550 W
141.002 Heating element 230 V~ 1050 W
136.916 Heating element 230 V~ 1550 W
145.606 Heating element 230 V~ 3300 W
Replacing the heating elements
1
5
Black (blower phase)
2
6
Blower and heating
Brown (heating phase) gray (neutral conductor)
142.967 Power supply cord (Rubber)
with WAGO Plug 3 × 1 mm² × 3 m
143.131 Power supply cord (Silicone)
with WAGO Plug 3 × 1 mm² × 3 m
142.976 Plug with strain relief, kit (WAGO 770)
cable ø 4.5 – 8 mm
148.429 Plug with strain relief, kit (WAGO 770)
(BR4)
cable ø 8 – 11.5 mm
3
7
Brown (blower phase)
4
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Igniter br4

Tabla de contenido