5. Commissioning, operation
5.2.2
Back pumping in external gas compartment (pressurised)
Requirement:
The filling pressure of the external gas compartment is between 1.3 ... 10 bar abs.
(SF₆-Q-Analyser)
EN
The filling pressure of the external gas compartment is between 1.3 ... 12 bar abs.
(g³-Q-Analyser)
1. Connect "Inlet, return pumps " to the gas compartment to be measured.
2. Connect "Outlet for gas cylinder " to the external gas compartment.
The gas compartment is connected.
5.2.3
Back pumping in external gas compartment (depressurised)
1. Connect "Inlet, return pumps " to the gas compartment to be measured.
2. Connect "Outlet for gas recovery bag " to the external gas compartment.
The gas compartment is connected.
5.3

Switching on and off

Switching on
Press On/Off switch.
A self-test is performed.
The residual gas is filtered.
The instrument is ready for operation.
Start screen with sensor values is displayed (the actual display may vary from the
example).
Switching off
Press the following button.
16
WIKA operating instructions analytic instrument, model GA11