Descargar Imprimir esta página

PROTEOR Matik 1P200 Instrucciones De Montaje página 6

Ocultar thumbs Ver también para Matik 1P200:

Publicidad

Idiomas disponibles

Idiomas disponibles

Alignments recommended when assembling the prosthesis
Load line
Motion of the instantaneous center of rotation of the knee
-
Stability
H Heel
height
≈1/3
+
Stability
Hip joint center.
The load line goes from 0 to 10mm
(0 is recommended) forward the
upper anterior axis (theoretical
rotation axis of the knee).
Foot alignment : Please see the
instructions sheet of the foot
≈2/3
Stability adjustment.
1– To increase stability, tilt the knee as
indicated on the opposite sketch (to move
the instantaneous center of rotation
backwards) using the upper and lower
connectors.
To decrease stability, proceed conversely.
2– Use the intermediate connectors to
re-position the foot according to the
recommended alignments.
The 1P200-KD model (connection with a
M36x1,50 screw) does not allow the stabi-
lity adjustment to be changed. Therefore
the socket must be made with accuracy.
1P20099-0313
Page 6/13

Publicidad

loading

Este manual también es adecuado para:

Matik 1p200-kd