optimum compaction can not be guaranteed, however, if layer depths are reduced and number of passes increased, results can be
improved.
the plate instead of compacting. If the moisture content is too high the material may dry out after compaction and shrinkage will occur.
2
1400 - 1800 kg/m
Cohesive Materials**
Granular Materials**
Bituminous
recommended by HAUC.
CAUTION
Honda GX120 & GX160
to the left. If restarting a warm engine, the choke is usually not required, however,
if the engine has cooled to a degree, partial choke may be required.
4.
Set the throttle to the idle position by moving the throttle lever fully to the right. Do
not start the engine on full throttle, as the compactor will vibrate as soon as the
engine starts.
handle with the other. Pull the recoil starter until engine resistance is felt, then
let starter return.
Hatz 1B20-7 Diesel Engine
engine resistance is felt, then let the starter return.
4.
Taking care not to pull the starter's rope fully out, pull the starter handle briskly with both hands.
7.
To stop the engine, set the throttle control to idle, then press and hold the red stop button until the engine stops.
Applications
COMPACTION PASSES REQUIRED PER LAYER OF COMPACTED THICKNESS UP TO:
40mm
60mm
4**
Start and Stop Procedure
80mm
100mm
4*
23
150mm