Kohler K-302 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-302:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Temporary
Nipple
Elbow
1/2" Copper
Tubing
Adapters
1/2" Copper
Tubing
Temporary
Elbow
Nipple
2. Bath and Shower Installation
NOTE: Typical dimensions for bath and shower installations are
shown on the rough-in diagram.
NOTE: Refer to the trim installations for specific requirements.
NOTE: Refer to the handle installation instructions for possible
rough-in depth requirements.
NOTE: The faucet fitting is factory assembled for hot and cold
water.
Unless otherwise instructed, rough-in the supply yoke 2-1/4" (5.7
cm) minimum to 3" (7.6 cm) maximum from the centerline of the
yoke to the outside of the finished wall.
Install 1/2" hot and cold supply tubing.
If specified, install the screwdriver stop valves.
NOTE: The 3-valve yokes have no embossed graphics for the
showerhead and spout locations.
113212-2-AC
Yoke
1/2"
Threaded
Pipe
Union
1/2"
Sweat
Copper
Union
1/2" Copper
Tubing
1/2"
Piping
4
Stop
Valve
1/2"
Piping
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-303K-6934

Tabla de contenido