PLYMOVENT Multidust bank BM-2 Instrucciones Para El Uso página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

• Remove blinding plugs in a suitable position/module.
• Install the glands in the backside and the inner wall.
• Fit pressure hoses as shown.
For all controller CONT-B models, 2 pressure reading points
are needed, gauge manometer + control box (alarm).
NOTE: ONLY MODELS WITH CONTROL BOX CONT -B AND -C.
• Fit pressure reading hoses from the back of the filter
module to + and - on the control box.
NOTE: ONLY MODELS WITH CONTROL BOX CONT -A AND -B.
• Fit pressure reading hoses from the back of the filter
module to the gauge manometer, - to Hi and + to Lo.
0000100513/011212/0 MDB
360 mm (14.2")
Control box (B/C)
L
H
17
0

Publicidad

Tabla de contenido
loading

Tabla de contenido