Twin-Star International 23MM9501 Instrucción De Montaje página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Carefully lift the Glass Top (G) on the top of the
cabinet . Use Allen Key (RR) screw the Bolts (CC)
and Washers (GG) into the metal support post
through the pre-drilled holes in the Left Frame (F),
Middle Panel (B) and Right Panel (C). as Shown In
Diagram.
HAND TIGHTEN ONLY.
Hardware Used
Bolt
CC
1/4 in. x 7/8 in.
Washer 16mm
GG
Allen Key
RR
7. Insert Glass Shelf (H) into the Clips (II), allow Glass
Shelf (H) to rest on the Shelf Pad (KK), then tighten
the Clip (II-1) with Bolt (II-2).
Hardware Used
Clip (II-1,II-2)
II
Allen Key
RR
8. Locate the Angel Iron (QQ) to the bar of Base (A),
using Bolt (DD) and Washer (GG) through the
pre-drilled hole.
Hardware Used
Bolt
DD
1/4 in. x 5/8 in.
Washer 16mm
GG
Angle Iron
QQ
Allen Key
RR
Fig. 6
x 6
x 6
F
Fig. 7
x 4
H
H
Fig. 8
x 2
x 2
x 2
6
G
C
B
II-1
II-2
RR
DD
GG
QQ

Publicidad

Tabla de contenido
loading

Tabla de contenido