OBO Bettermann GE 2V 15 VO Instrucciones De Montaje página 26

Unidad portamecanismos con entalladura de pavimento y toma de corriente con toma de tierra doble
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
Laying the screed
C lose the hinged cover and attach the steel
plate and mounting cover .
Note: We recommend routing the screed with-
out an additional separation layer . A separation
layer can be used to reduce noise transmission,
although this reduces fixed anchoring of the ser-
vice unit in the screed .
L ay the screen flush to the top edge of the
mounting cover and work it up to the service
unit .
Performing the electrical installation
R emove the mounting cover and steel plate
and dispose of them . Open the hinged lid .
I nsert strain reliefs in front of the installation
pipe .
I nsert the connection cable for the sockets
and strip it by approx . 150–200 mm .
F ix the connection cable by pushing the
strain relief together .
26

Publicidad

Tabla de contenido
loading

Productos relacionados para OBO Bettermann GE 2V 15 VO

Este manual también es adecuado para:

7368 399

Tabla de contenido