Assembly - Beretta 750 Instrucciones Para El Usuario

Resistencia eléctrica
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
INSTALLATION
INSTALLATION

5 ASSEMBLY

Before beginning to install:
− Switch the electricity supply to the storage cylinder's
valve group and to any associated boiler OFF at the main
switch and at the control panel
− Close the shut-off cocks for the domestic hot water circuit
− Empty the boiler's domestic circuit.
INSTALLATION ON BOILER
− Remove the cover of the flange with the insulation (A)
− Unscrew the nuts (B) and remove the flange from the
storage cylinder, using an M8 bolt screwed into the
threaded hole (C).
C
9
Keep the nuts safe.
− Check the sealing wear condition (D) and if necessary re-
place it with the one supplied with the accessory.
− Insert the flange with heating element (1) in the boiler
− Fasten the heating element flange (1) using the nuts (B),
previously removed as shown in the figure
9
Fill the boiler and check the hydraulic sealing of the seals
(flange and heating element).
B
A
D
1
B
− Insert the threaded pin (4), keeping the thread exposed
for 20 mm
− Place the bracket (2) keeping it turned (not vertical) so as
to facilitate the access to the heating element terminal
board and impress the nut (5)
4
− Perform the electrical connections between thermostat
and heating element described in paragraph "Electrical
connections"
9
Make sure the terminal lugs and nuts are securely fastened.
− Perform the rest of the electrical connections from the
thermostat to the power supply (see "Wiring diagrams")
− Fit the flexible insulation (10)
− Tighten completely the fastening nut (5)
14
1
2
5
10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

800100020131666201316672013166920131670

Tabla de contenido