Control Panel - Lamborghini Caloreclima MEGA Serie Manual De Instalación, Uso Y Mantenimiento

Calderas presurizadas de acero
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONTROL PANEL

The instrument panel supplied, made from plastic with index of protection IP40, holds the control and safety instruments.
The boiler must be connected to 230V - 50Hz single-phase + earth mains power, in compliance with the following requirements.
- The system must be compliant with the SAFETY STANDARDS IN FORCE.
- Use of a two-pole mains disconnect switch, compliant with the IEC-EN standards (minimum contact opening 3 mm).
- Observe the polarity L (Phase) - N (Neutral).
- Use cables with a minimum cross-section of 1.5 mm
- Refer to the wiring diagrams in this booklet for any operations on the electrical system.
- Connect the appliance to an effective earth system.
- A connection point is provided on the front head for earthing the boiler body.
1
2-stage thermostat, 1
2
Thermometer
3
Main switch + power indicator light
4
System pump switch
5
Burner switch
6
Hour counter
7
Burner lockout indicator light
8
Safety thermostat reset button
9
Space for temperature controller
2
.
1
8
9
st
-2
nd
flame
- 40 -
2
3
4
7
GENERAL
5
6

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido