Aqua Marina BREEZE BT-19BRP Manual De Instrucciones página 10

Ocultar thumbs Ver también para BREEZE BT-19BRP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2
1
3
D
Slide-in Center Fin Installation
Once the board is inflated, slide in the large Center Fin to the fin base
and insert the push-in pin.
E
Deflation
To deflate your board, follow the instructions below.
1. Release valve cap by twisting counter-clockwise. Ensure the valve is
clear from debris, sand, or dirt before releasing.
2. Push valve button in and turn clockwise to lock it in DOWN position.
For Double Chamber Board
For best performance, the double chamber
should always be inflated to ensure the
highest stiffness and safety.
• Pre-inflate the outer chamber to 10 PSI.
• Inflate the inner chamber up to 10 PSI.
• Inflate the outer chamber up to 15 PSI.
10

Publicidad

Tabla de contenido
loading

Tabla de contenido