Haier AP48KS1ERA Manual De Funcionamiento Y Manual De Instalación página 18

Ocultar thumbs Ver también para AP48KS1ERA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation Procedure
Selection of indoor unit installation place
Place where it is easy to route drainage pipe and outdoor piping.
Place away from heat source and with less direct sunlight.
Place where cool and warm air could be delivered evenly to every corner of the room.
Place near power supply socket. Leave enough space around the unit (refer to installation drawings).
Installation of indoor unit
1.Position of the wall hole
Wall hole should be decided according to installtion place
and piping direction. (refer to installation drawings)
2.Making a wall hole
Drill a hole of 70mm dia. with a little slope towards outside.
Install piping hole cover and seal it with putty after installation.
3.Fixing of indoor unit
With the unit set up vertically, fix the fitting metal to the unit
with screws, then fix the fitting metal to the wall with cement
nail and washer, as shown right:
Moreover, if wanting to fix the unit more firmly, you should
fix the bottom panel to the ground with concrete bolts, as
shown right:
Screw
Fitting hole
16
INDOOR SIDE
OUTDOOR SIDE
wall hole
wall thickness
70mm
( Cross section of wall hole )
Cement nail
Fitting metal
330
4- 14 hole 30 depth
Bottom Panel
Indoor Unit
2- 10 hole
260
130

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ap60ks1eraAp48ds1era

Tabla de contenido