Installation And Lubrication - Ingersoll Rand 2100G Especificaciones Del Producto

Ocultar thumbs Ver también para 2100G:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN

Installation and Lubrication

Size air supply line to ensure tool's maximum operating pressure (PMAX) at tool inlet. Drain
condensate from valve(s) at low point(s) of piping, air filter and compressor tank daily. Install a
properly sized Safety Air Fuse upstream of hose and use an anti-whip device across any hose
coupling without internal shut-off, to prevent hose whipping if a hose fails or coupling
disconnects. See drawing 45667631 and table on page 2. Maintenance frequency is shown in a
circular arrow and defined as h=hours, d=days, and m=months of actual use. Items identified as:
1. Air filter
2. Regulator
3. Lubricator
4. Emergency shut-off valve
5. Hose diameter
Parts and Maintenance
When the life of the tool has expired, it is recommended that the tool be disassembled,
degreased and parts be separated by material so that they can be recycled.
The original language of this manual is English.
Tool repair and maintenance should only be carried out by an authorized Service Center.
Refer all communications to the nearest Ingersoll Rand Office or Distributor.
EN-2
6.
Thread size
7.
Coupling
8.
Safety Air Fuse
9.
Oil
10. Grease - through fitting
04579736_ed3

Publicidad

Tabla de contenido
loading

Tabla de contenido