Descargar Imprimir esta página

IB RUBINETTERIE Jump JU202 Instrucciones De Montaje página 4

Publicidad

Fig.
3/
3
Avvitare i due flessibili 3-G, inserire le due guarnizioni con filtro
idrica.
Screw on the two flexible hoses 3-G, insert the two gaskets with filter
the water system.
Visser les deux flexibles 3-G, insérer les deux joints avec filtre
hydrique.
Enroscar los dos tubos flexibles 3-G, introducir las dos juntas con el filtro
a la red hidráulica.
Aparafusar os dois flexíveis 3-G, inserir as duas guarnições com filtro
hídrica.
IMPORTANT
Pressure & Temperature Requirements.
Hot and cold water inlet pressures should
be equal.
Inlet pressure range: 150-1000 kPa
New Regulation: -500 kPa maximum operating
pressure at any outlet within a building.
(Ref. AS/NZS 3500.1-2003, Clause 3.3.4)
Maximum hot water temperature: 80°C.
3-G
3-H
3-H
e collegare a rete
3-H
and connect to
3-H
et raccorder au réseau
3-H
y conectarlos
3-H
e conectar à rede
IB RUBINETTERIE s.p.a.
via dei Pianotti 3/5
25068 Sarezzo (BS)
phone +39 030 802101
fax +39 030 803097
ibrubinetterie@ibrubinetterie.it
www.ibrubinetterie.it

Publicidad

loading