10.28 Feedwater process values
Click on process values, then B, the feedwater process values
will be displayed.
G
T
A
t
Click on the process values
Thresholds (T), totalisers (t), alarms (A) and graph settings (G) can be set up for the Feedwater
Process, for full details see B850 Boiler House Energy Monitor Installation and Maintenance
Instructions IM-P408-03. The Quickstart Configuration is pre-configured with suitable settings.
The Quickstart Configuration is pre-configured with suitable settings.
It is recommended that at least 1 totaliser for the Feedwater Process is configured.
IM-P408-04 AB Issue 2
31