Machine Set-Up; Installing Pad; Installing Filters - Tornado 2500B Glazer Manual De Operación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing Pad

NOTE: Consult your authorized distributor for pad recommendations:
1. Turn off machine and tilt machine back on rear wheels.
Tip: Pulling the machine in reverse a few feet will turn the casters, making it easier to tilt
the machine backward.
FOR SAFETY: Before leaving or servicing machine, stop on level surface..
ATTENTION: Do not leave machine tilted back for an extended time, battery acid may
leak.
2. Attach the pad to the pad driver and secure pad with centerlock.
ATTENTION: Do not operate machine without a pad and / or centerlock in place
3. After installing pad, return machine to operating position.

Installing Filters

1. Set Filters over rubber gasket so a complete seal is made.
1.800.VACUUMS
a new spin on cleaning

Machine Set-Up

a Tacony Company
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9849898499

Tabla de contenido