5. Finish securing chute control assembly to chute support bracket
with wing nut and hex screw removed earlier. See Figure 5.
6. Check that all cables are properly routed through the cable guide
on top of the engine. See Figure 6.
The extension cord is fastened with a cable tie to the rear of the auger
housing for shipping purposes. Cut the cable tie and remove it before
operating the snow thrower.
Clean-Out Tool
This item is fastened with a cable tie to the rear of the auger housing
at the factory. Cut the cable tie before operating the snow thrower. To
use:
1. Release both the auger control and the drive/auger control lock.
2. Stop the engine by moving the throttle to the stop position.
3. Remove the clean-out tool from the mounting clip. See Figure 7.
4. Use the shovel-shaped end of the clean-out tool to remove any
snow and ice in the chute assembly.
5. Re-fasten the clean-out tool to the mounting clip on the rear of the
auger housing and restart engine.
6. While standing in the operator's position (behind the snow thrower),
engage the auger control for a few seconds to clear any remaining
snow or ice from the chute assembly before continuing to clear
snow.
Shear Pin Storage
Holes are located in the plastic dash panel for convenient shear pin
storage. See Figure 8.
IMPORTANT: This unit is shipped with the engine full of oil. After
assembly, see page 10 for fuel and oil fill-up details.
Figure 8
ASSEMBLY
7
Figure 5
Figure 6
����� ��������� ����
Figure 7