CMP DEL Ozone 25 Instrucciones De Instalación Y Manual Del Producto página 10

Ocultar thumbs Ver también para DEL Ozone 25:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 2 Installation
Add an arrow that points to the join of the
green ozone tube to the assembly, and
entitle it "Flow Meter Assembly:
Flow Meter
Assembly
Injector
Assembly
2D-3. Pressure Test
If a pressure test is required, it should be performed prior to
connecting the Ozone Gas Line. Install the 3/4" pipe cap provided
onto the Injector for the pressure test.
2D-4. Flow Test - Refer to Figure 3a.
1. Install Tube Adapter on injector. Use Teflon thread tape as needed.
2. Connect the Flow Meter Assembly to the Tube Adapter.
3. Hold the Flow Meter Assembly so that the clear plastic chamber is
vertical with the tubing on top.
4. Turn on the pool's circulation system as this allows the Injector
Assembly to pull a vacuum. Under normal operation, the ball in the
Flow Meter Assembly will be floating in between its Max and Min
line. Under worst-case system conditions the flowmeter ball should
indicate at least a small amount of air flow. Flow may be adjusted
as described below.
Figure 3a: Flow Meter Assembly
5
Tube
Adaptor

Publicidad

Tabla de contenido

Solución de problemas

loading

Productos relacionados para CMP DEL Ozone 25

Este manual también es adecuado para:

Del ozone 50Del ozone 100

Tabla de contenido