Section 2 Installation
Adjustable Injector Manifold: Gas flow can be controlled by
adjusting the Valve on the Manifold. Close the valve to increase gas
flow, open the Valve to decrease gas flow.
Rigid Injector Manifold: This Manifold is equipped with a
DELCheck
spring loaded valve. It cannot be adjusted, but provides a
TM
wide operating range. If more gas flow is necessary, verify that other
valves in the system are not inhibiting flow through the Manifold. If
you experience complications see TROUBLE SHOOTING Section 4D.
2D-5. Ozone Tube Connection - Refer to Figure 3b.
After the system has been set for the correct flow rate, Remove the
Flow Meter Assembly and connect the Ozone Tube between the Ozone
Outlet Barb on the DEL Ozone generator, and the Tube Adapter on the
Injector Assembly. Ensure that the Check Valve arrow is pointing toward
the injector. If equipment is above water level, cut off the excess tubing
so that the line from the injector to the DEL Ozone generator is as
straight and free from dips and loops as possible. If equipment is below
the water level, run tubing to a point above water level. Ensure that all
tube connections are secured with clamps.
Add arrow pointing to
the green square
between the ozone
tubes that says "Check
Valve Assembly"
Check Valve
Ozone Tube
Figure 3b: Ozone Tube Assembly
6
Flow of
Check Valve
Add down arrow here with
the supporting text "Flow of
Check Valve"