MTD 020 Serie Manual De Instrucciones página 8

Ocultar thumbs Ver también para 020 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3
Setting
Up Your
Chipper
Shredder
Vacuum
NOTE:
The bag/chute
switch button attached to
the mounting bracket must
be fully depressed by the
tip of front tab on the blower
chute or engine will not
start.
B
A
Figure 3-5
Figure 3-6
ATTACHING THE BAG
1.
Grasp bag handle with one hand and slide locking
rod on mounting bracket with other hand toward
engine. Use the end of mounting bracket as leverage
when sliding the locking rod.
2.
Slip bag over the rim of the discharge opening and
release locking rod to secure bag in place. See
Figure 3-5.
3.
Snap bag clip to the top of the lower handle.
4.
Place lower straps on the bag over the top of lower
handle, hooking them on the studs. See Figure 3-6.
NOTE: The bag/chute switch button attached to the
mounting bracket must be fully depressed by the tip of
front tab on bag handle when securing the bag or engine
will not start.
8

Publicidad

Tabla de contenido
loading

Tabla de contenido