Haier GE USYF09UCDWA Instrucciones De Instalación página 12

Ocultar thumbs Ver también para GE USYF09UCDWA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
Final Check
Start Up Checklist
Refrigerant charge is verified and system has been
leak tested
Line sets have been insulated
Electrical connections are secure
Has the electrical ground been checked and verified
Electrical wiring terminals match at indoor and outdoor
unit
Wire between outdoor and indoor must be 14/4
stranded
The outdoor to indoor wires free of splices
Condensate drain has correct pitch and has been leak
tested
Explaining Operation to the End User
• Using the User Manual, explain to the user how to use the air conditioner/heat pump, (the remote controller, adding/
removing the air filters, placing or removing the remote controller from the remote control holder, cleaning methods,
precautions for operation, etc.)
• Review precautions for operation.
• Recommend that the user read the Operating Instructions carefully.
12
Indoor and outdoor units match
Indoor and outdoor units are firmly mounted
Power source voltage is within tolerances
The indoor and outdoor sections are quiet and free of
vibration
All functions of the controller have been verified
Operation in cooling or heating modes is normal
Operation of the system has been explained to the
owner
31-5000496 Rev. 1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ge usyf12ucdwaGe usyf18ucdwa

Tabla de contenido