INSTALLATION: EXPANSION & CONTRACTION
Acclimating Boards
Installation can take place over a few days, resulting in varying
installation temperatures, depending on the project site, the
boards may experience differing heating and cooling rates.
Allow boards to acclimate on-site for 24 hours before
installing. Once the installation is complete, wait to cut the
ends of the installed boards to the desired length in order to
allow the boards to fully acclimate to the site�
As shown in Fig� 1�
DECKING INSTALLATION : I-SERIES
7