Ashland SW50 Manual De Usuario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing Pump in Sump
These pumps are usually installed in concrete or fiber-
glass basins with the lift-out rail system. Figure 3 shows
pump mounted on the rail system. Instructions for install-
ing rail system are furnished with rail package.
If pump is not installed with lift-out rail system it must be
properly supported on legs and connected to discharge
pipe so that space is provided under pump for entrance
of sewage. Pump inlet should not be closer than 2 inches
from bottom of sump.
It is not generally
desirable to install
these pumps without
the rail system except
on special O.E.M.
packaged
systems. Check valves
should always be
installed along with
shut-off valves. This
allows for easier
service and prevents
backflow into basin.
FIGURE 3
Sewage Pumps
Model: SW50 & SW75 Series
Installation
Starting Pump After Installing in Sump
Before lowering pump into basin, connect power lines
and start motor. Impeller should turn counterclockwise
when looking at impeller.
Service and Repair
Important: Pump should be thoroughly cleaned of trash
and deposits before starting disassembly operations
(pages 6-8).
WARNING
Disconnect all power and control wires to motor at
control panel before starting disassembly operation.
Never rely on opening circuit breaker only.
CAUTION
Operating pump builds up heat and pressure; allow time
for pump to cool to room temperature
8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sw75

Tabla de contenido