Installation and Putting into Operation
Gas connection
The machine's gas connection is located at the rear.
Working pressure a maximum of 1.5 bar.
Arrow buttons
Changing of the parameter values.
Pressing and holding the button changes the value first in
small increments and then in larger increments.
Operating Instructions- Translation
Display
Display of the currently saved parameter value
Display of the actual evacuation, gassing or sealing time
Display OO: Machine is in Standby
- -
Display
During packaging cycle, when the machine is working
-
outside the set parameter values.
GAS ON/OFF has been pressed but the machine is
-
without a gassing functionality.
Display Er: Error, Machine is locked
You can cancel the locking by switching the machine off and
by switching it on again.
Display OL: Check the oil level and quality.
You can acknowledge the oil check by pressing VAC STOP.
Display SE: Service program is active.
You can cancel the service program by pressing VAC STOP.
19 04 249 - 01.01.2012
Eng - 16 /32