Cola SPRINT maiolica Manual De Instalación, Uso Y Mantenimiento página 48

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Before working on the sheet metal tile holder, bend the tabs inward with suitable equipment to minimise
the play and ensure proper stability of the tile.
Fit the tiles checking the final coupling.
Position the upper tile in its place. Refit the
complete front panels, fixing them with the
screws (step 5).
Connect the power cable to the household
electrical system and turn on the stove, checking
its proper operation and following the instructions
in the manual supplied.
48
SPRINT ** maiolica

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

La1mf00y

Tabla de contenido