Vac Assembly
1. Line up vacuum port in top assembly
with drain cap located on the front of
the drum.
2. Place lid on top of drum with the han-
dles snug against the drum channel.
3. Be sure lid completely covers the top of
the drum so leakage does not occur.
4. Push down on top of the locking tab
areas to cause the flexible locking tabs
to hook onto the drum lip of the chan-
nel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid from
coming off. (See inset)
6. For WD1635, rotate both drum latches
down until you hear them snap over lip
of the drum.
Your new wet/dry vac is ready for use.
Drum
Channel
WD16350
Push
Down
Pull Out
Flexible
Locking
Tab
Top Assembly
Top Assembly
WD12450
Cord Wrap
Area
Blower
Port
Power
Cord
Dust
Drum
Caster Feet
w/Accessory
Storage
Cord Storage
Simply, wrap the power cord around the
power head and snap the connector on
the plug to a wrap of the cord..
Push
Down
Out
Pull Out
Drum
Latch
Tab
Out
Drum
Flexible
Channel
Locking
Tab
6
On-Off Switch
Drain Cap
WD16350 Shown
Drum
Latch
Pull
Handle
Hose
Casters
Drum
Drum